Establishing the lighting Program
-Assemble CDL project team and primary contact
-Meet with client and design team to discuss lighting goals
-Identify the specific program requirements
-Consider possible equipment specifications
Schematic and Design Development
-Prepare conceptual lighting plans
-Present to client and team for feedback
-Revise concept and develop details
-Develop budget for execution of design
-Consider equipment availability, quality and scheduling
-Present final design and budget to client and design team for approval
Construction Documentation
-Prepare all plans and details in AutoCAD format
-Prepare specifications for all lighting and control systems (if applicable)
-Prepare and execute final schedule for production of all work
-Present final documentation to client and design team for approval
Contract Administration
-Assist client, architect, interior designer, and general contractor in obtaining and valuating bids
-Review all shop drawings for conformance to design intent
-Visit jobsite to coordinate initial installation with electrical contractor
-Continue jobsite visits to ensure proper location and installation of specialty lighting (cabinetry, coves, niches, water features, and special architectural detailed areas as required)
-Prepare punch list once installation is complete
Final Aim and Focus
-Travel to jobsite with technical crew for final adjustment of all lighting fixtures utilizing special lens, louvers, and lamps to create the drama and effect intended of the lighting system. -Making the interior and/or exterior come alive and accomplishing the desired effect expected by clients
-Final programing of the lighting control system to desired lifestyle usage of clients
|